BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20180720T150000Z
DTEND:20180720T153000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Ribbon Cutting - Floyd/Outer Drive Trail Connection
DESCRIPTION:Please join us to celebrate the completion of the Floyd/Outer Drive Trail Connection Project. This projects closes the loop between two trail systems\, the existing trail that ends at the intersection of Floyd Boulevard and Outer Drive to the existing Floyd River Trail including a bridge over the Union Pacific Railroad tracks. \n\n\n\nAttendees are welcome to bike to the event\, but if you must drive parking is available in the green space near the trail off Jefferson Street.
X-ALT-DESC;FMTTYPE=text/html:Please join us to celebrate the completion of the Floyd/Outer Drive Trail Connection Project. \; This projects closes the loop between two trail systems\, the existing trail that ends at the intersection of Floyd Boulevard and Outer Drive to the existing Floyd River Trail including a bridge over the Union Pacific Railroad tracks. \; \;
\n
\nAttendees are welcome to bike to the event\, but if you must drive parking is available in the green space near the trail off Jefferson Street.
LOCATION:In front of the bridge at the intersection of Floyd Blvd and Jefferson Street
UID:e.769.4793
SEQUENCE:3
DTSTAMP:20240328T102104Z
URL:https://directory.siouxlandchamber.com/events/details/ribbon-cutting-floyd-outer-drive-trail-connection-4793
END:VEVENT
END:VCALENDAR